Kemess Technical Reports
AuRico filed an updated NI 43-101 compliant technical report for the Kemess Underground (KUG) Project on SEDAR (www.sedar.com) on May 6, 2016. This technical report provides details for all aspects of the KUG Project Feasibility Study. The technical report can be viewed here.
AuRico also announced an updated Feasibility Study for the KUG Project on March 23, 2016. The results indicated that the KUG Project is a robust, low-risk project benefiting from extensive infrastructure in place. The feasibility study can be viewed here.
AuRico filed an updated NI 43-101 compliant technical report for the Kemess East (KE) deposit resource estimate on SEDAR (www.sedar.com) on July 14, 2017. This report is part of the KUG Project technical report as both deposits are located on AuRico’s 100%-owned Kemess property in British Columbia. The report can be viewed here.
View the 2016 Dam Safety Review here
View the 2015 Dam Safety Inspection Report here
The 2016 Dam Safety Review by Golder Associates is a comprehensive Dam Safety Review by independent geotechnical engineers of the Tailings Storage Facility (TSF).
The 2015 Dam Safety Inspection Report discusses the annual Kemess South (KS) TSF inspection by AuRico’s consulting geotechnical engineers (AMEC Foster Wheeler Environment & Infrastructure).